Projects

Provision of Shore Approach Services in Support of the Jangkrik Complex Project

ENI Muara Bakau (Operator) in joint venture with GDF Suez (45%) is developing the Jangkrik Complex Project (JKK) inclusive of Jangkrik Main (JKK Main) and Jangkrik North East (JKNE Fields).
The JKK Complex is located in the Muara Bakau PSC permit area, approximately 70km off the coast of Makassar Strait, Offshore Borneo of Indonesia.
Water depths in Jangkrik Complex are ranging from 200 to 500m. The subsea development consists of seven (7) wells at JKK Main field and four (4) wells at JKNE field tied back to a spread moored FPU with full treatment facilities.
Seven (7) subsea wells of JKK Main field will be drilled from three (3) drilling centres named Drill Centre Cluster 1, Drill Centre Cluster 2 and Drill Centre Cluster 3.
Production of these drilling centres will be gathered by 3 manifolds named Manifold 1, Manifold 2 and Manifold 3. Two (2) of JKNE field wells will be satellite wells, connected to an intermediate manifold named Manifold NE2.
The remaining two (2) wells will be drilled from a drilling centre named Drill Centre Cluster NE1, where a manifold named Manifold NE1 will gather the production of these two wells.
The multiplexed electro hydraulic control system comprises main umbilical starting from the FPU and terminating at respective Umbilical Termination Assembly (UTA).
The UTAs are connected to a Subsea Distribution Units (SDUs) by means of electro hydraulic flying leads. The electro hydraulic flying leads will also connect the UTAs/SDUs to the subsea control module (SCM) on the subsea wellheads/manifolds to control and monitor the subsea wellheads/manifolds.
The treated gas and condensate from FPU are then exported via 24 inch treated gas export pipeline and 4 inch condensate export pipeline to shore at Sapi Landfall. An onshore receiving facility (ORF) fiscal metering system for gas and condensates is located approximately 4kms downstream of Sapi Landfall.
Gas and condensates pipelines are then tied-in to the existing East Kalimantan Pipeline Network. Final destination of Jangkrik treated gas is to the Bontang LNG Plant and local market; and the final destination of Jangkrik condensate is to the Senipah Plant.

PT Timas Suplindo was awarded to providing the Services in strict compliance with the requirements of all relevant local legislation, any existing codes of practice for installation works, review all documents and drawings and is deemed to be fully familiar with the conditions of the worksite. For sake of clarity, KP shall refer at all times to Gas Export Pipeline KP. The scope of Services shall consist of the following activities:
• Landfall site preparation,
• Pre-trenching operations from KP 72.243 (LTE) to KP 71.1,
• Shore pull operations,
• Pipelaying (4” piggybacked to 24”) from KP 71.1 to KP 37.7,
• Mechanical backfilling for water depth less than or equal to 13m MSL,
• Post-trenching operations from KP 71.1 to KP 38.5.

Other Projects
Eastern Hub Mercury Removal (EHMR) Water Project
Eastern Hub Mercury Removal (EHMR) Water Project
KF Gas Booster Compression Project
KF Gas Booster Compression Project
Lima Power And Safety System Upgrade Project
Lima Power And Safety System Upgrade Project
UL Development Project
UL Development Project
Waste Heat Recovery Steam Generator Project
Waste Heat Recovery Steam Generator Project
Design and Fabrication Equipment Module for Minas Surfactant
Design and Fabrication Equipment Module for Minas Surfactant
EPC of Water Tanks Facility in Three Gathering Station
EPC of Water Tanks Facility in Three Gathering Station
Anoa Phase AGX Compression Reconfiguration
Anoa Phase AGX Compression Reconfiguration
Tembang 8 to Bawal Pipeline System Permanent Tie-Ins
Tembang 8 to Bawal Pipeline System Permanent Tie-Ins
Engineering and Installation Services for Jangkar Umbilical Project
Engineering and Installation Services for Jangkar Umbilical Project
Bukit Tua Field Development
Bukit Tua Field Development
Lima Subsidence Remediation Project
Lima Subsidence Remediation Project
Pembangunan Main Oil Line (MOL) Dari Anjungan XA Process Lapangan X-Ray ke Pusat Pengumpul Produksi
Pembangunan Main Oil Line (MOL) Dari Anjungan XA Process Lapangan X-Ray ke Pusat Pengumpul Produksi
Reroute Gas Pipeline L-Parigi-Cilamaya Project
Reroute Gas Pipeline L-Parigi-Cilamaya Project
EPCI Subsea Facility of TSB Field Development Project
EPCI Subsea Facility of TSB Field Development Project
Ujung Pangkah CPP and AUP Platform Installation Contract
Ujung Pangkah CPP and AUP Platform Installation Contract
Pagerungan Utara Offshore Installation for Wellhead Platform Project
Pagerungan Utara Offshore Installation for Wellhead Platform Project
North Belut Pipelines Installation Project
North Belut Pipelines Installation Project
North Belut Installation of Wellhead Platform Project
North Belut Installation of Wellhead Platform Project
Kambuna Offshore Topside, Riser, and Pipeline Installation
Kambuna Offshore Topside, Riser, and Pipeline Installation
CNOOC EPCI MILA-A And ASTI-A Platforms And Pipelines Project
CNOOC EPCI MILA-A And ASTI-A Platforms And Pipelines Project
EPCI Services For Infill Well Facility Tie In KRA SOUTH 2 Project
EPCI Services For Infill Well Facility Tie In KRA SOUTH 2 Project
EPCIC Of The Pipeline System For Lampung LNG Floating Storage Regasification Facilities
EPCIC Of The Pipeline System For Lampung LNG Floating Storage Regasification Facilities
TOTAL E&P Indonesie Bekapai Phase 2B EPSC2 Project
TOTAL E&P Indonesie Bekapai Phase 2B EPSC2 Project
Provision of Shore Approach Services in Support of the Jangkrik Complex Project
Provision of Shore Approach Services in Support of the Jangkrik Complex Project
KG & KH Riser Replacement Project
KG & KH Riser Replacement Project
KE30 Platform Installation and Subsea Pipeline Laying Project
KE30 Platform Installation and Subsea Pipeline Laying Project
SUBAN COMPRESSION PROJECT
SUBAN COMPRESSION PROJECT
TISSUE MACHINE BLOCK # 11.1 & 11.2 PROJECT
TISSUE MACHINE BLOCK # 11.1 & 11.2 PROJECT
OKI Pulp & Paper Project
OKI Pulp & Paper Project
PENGGANTIAN 1 UNIT SUB STATION
PENGGANTIAN 1 UNIT SUB STATION
CNG Plant Bangkanai
CNG Plant Bangkanai
Viscose ,Spinbath & Spinning Civil Structure & Partition
Viscose ,Spinbath & Spinning Civil Structure & Partition
TREATED DESTILLATED AROMATIC EXTRACT (TDAE) PROJECT
TREATED DESTILLATED AROMATIC EXTRACT (TDAE) PROJECT
Replacement of Grease Plant in Jakarta Lubricants Production Unit of Marketing & Commerce Directorat
Replacement of Grease Plant in Jakarta Lubricants Production Unit of Marketing & Commerce Directorat
SLN Tank Repair and Replacement
SLN Tank Repair and Replacement
NPK Fusion Project
NPK Fusion Project
Engineering, Procurement, Construction and Installation (EPCI) of Subsea facility for TSB Phase 2
Engineering, Procurement, Construction and Installation (EPCI) of Subsea facility for TSB Phase 2
Buntal-5 Project Engineering, Procurement, Construction and Installation (EPCI)
Buntal-5 Project Engineering, Procurement, Construction and Installation (EPCI)
Offshore Pipeline and WHP Installation Services
Offshore Pipeline and WHP Installation Services
Transportation & Installation of Mini Platform
Transportation & Installation of Mini Platform
EPCI Subsea Facility for TSB Phase 2 Development
EPCI Subsea Facility for TSB Phase 2 Development
EPCI Services for the Bison, Iguana and Gajah Puteri (BIGP) Development Project
EPCI Services for the Bison, Iguana and Gajah Puteri (BIGP) Development Project
Construction Work at TDAE Plant Project
Construction Work at TDAE Plant Project
Penggantian Column 011C106 Beserta Accesoriesnya Di Area FOC-II
Penggantian Column 011C106 Beserta Accesoriesnya Di Area FOC-II
EPC for Suban Compression Project
EPC for Suban Compression Project
FL1 Project Mechanical and Piping Works (Package 1A, 2 and 3)
FL1 Project Mechanical and Piping Works (Package 1A, 2 and 3)
Fabrication and Pre Assembling Dew Point Control System And Production Cooler
Fabrication and Pre Assembling Dew Point Control System And Production Cooler
Deareator ID 3800 x 18560 T/T & Tower ID 2700 x 6000 T/T
Deareator ID 3800 x 18560 T/T &  Tower ID 2700 x 6000 T/T
Gajah Baru Project
Gajah Baru Project
MEG Injection Package
MEG Injection Package
Heavy Clad Vessel for Suban Gas Compression Project
Heavy Clad Vessel for Suban Gas Compression Project
Naptha Splitter Column ID. 4,000mm x 12t x 32,330mm
Naptha Splitter Column ID. 4,000mm x 12t x 32,330mm
EPCI Service Contract for: EPCI-1 : PHE-12, PHE-24 and CPP2 Platforms and Pipeline
EPCI Service Contract for: EPCI-1 : PHE-12, PHE-24 and CPP2 Platforms and Pipeline
RDMP Balikpapan Project
RDMP Balikpapan Project