Projects

Buntal-5 Project Engineering, Procurement, Construction and Installation (EPCI)

Client Name : Medco E&P Natuna Ltd.

Project Period : 15 August 2018 - 15 August 2020

Project Location : Natuna Sea, 80m Water depth

Project Scope :

Subsea Scope:

• Installation of 8 km new umbilical to Hang Tuah. Approx. 80 m of water depth

• Installation of Company’s free issued subsea production control system (UTA – Umbilical Termination Assembly, Flying Leads) and subsea protection structure.

Pipeline Scope:

• Installation of approx. 150m flowline/spool from Buntal 5 well tie in to existing MB-2 manifold.

Hang Tuah Topside Scope:

• Clear existing J-Tube and pull new umbilical

• Installation of Company’s free issued TUTU and associated connections

• Modification of existing SPCS for remote control, monitoring and shutdown of Buntal 5 well

Project Overview : Buntal-5 is a single subsea prospect located in close proximity to the Hang Tuah processing platform, ~8 km West of Hang Tuah Platform with water depth approximately 80 m. 
It is planned to be tied-back through existing subsea infrastructure. An approximately 150 m tie-in spool and new 8 km umbilical will be installed from Buntal-5 to Hang Tuah MOGPU in order to sustain gas delivery to Singapore (SembGas, GSA1)
Medco E&P Natuna Ltd. (COMPANY) intends to optimize, maintain and enhance its current production facilities and to develop new production facilities for near future in order to meet the production commitment of oil and gas, optimize production costs and minimize environmental pollution from the production process

Other Projects
Eastern Hub Mercury Removal (EHMR) Water Project
Eastern Hub Mercury Removal (EHMR) Water Project
KF Gas Booster Compression Project
KF Gas Booster Compression Project
Lima Power And Safety System Upgrade Project
Lima Power And Safety System Upgrade Project
UL Development Project
UL Development Project
Waste Heat Recovery Steam Generator Project
Waste Heat Recovery Steam Generator Project
Design and Fabrication Equipment Module for Minas Surfactant
Design and Fabrication Equipment Module for Minas Surfactant
EPC of Water Tanks Facility in Three Gathering Station
EPC of Water Tanks Facility in Three Gathering Station
Anoa Phase AGX Compression Reconfiguration
Anoa Phase AGX Compression Reconfiguration
Tembang 8 to Bawal Pipeline System Permanent Tie-Ins
Tembang 8 to Bawal Pipeline System Permanent Tie-Ins
Engineering and Installation Services for Jangkar Umbilical Project
Engineering and Installation Services for Jangkar Umbilical Project
Bukit Tua Field Development
Bukit Tua Field Development
Lima Subsidence Remediation Project
Lima Subsidence Remediation Project
Pembangunan Main Oil Line (MOL) Dari Anjungan XA Process Lapangan X-Ray ke Pusat Pengumpul Produksi
Pembangunan Main Oil Line (MOL) Dari Anjungan XA Process Lapangan X-Ray ke Pusat Pengumpul Produksi
Reroute Gas Pipeline L-Parigi-Cilamaya Project
Reroute Gas Pipeline L-Parigi-Cilamaya Project
EPCI Subsea Facility of TSB Field Development Project
EPCI Subsea Facility of TSB Field Development Project
Ujung Pangkah CPP and AUP Platform Installation Contract
Ujung Pangkah CPP and AUP Platform Installation Contract
Pagerungan Utara Offshore Installation for Wellhead Platform Project
Pagerungan Utara Offshore Installation for Wellhead Platform Project
North Belut Pipelines Installation Project
North Belut Pipelines Installation Project
North Belut Installation of Wellhead Platform Project
North Belut Installation of Wellhead Platform Project
Kambuna Offshore Topside, Riser, and Pipeline Installation
Kambuna Offshore Topside, Riser, and Pipeline Installation
CNOOC EPCI MILA-A And ASTI-A Platforms And Pipelines Project
CNOOC EPCI MILA-A And ASTI-A Platforms And Pipelines Project
EPCI Services For Infill Well Facility Tie In KRA SOUTH 2 Project
EPCI Services For Infill Well Facility Tie In KRA SOUTH 2 Project
EPCIC Of The Pipeline System For Lampung LNG Floating Storage Regasification Facilities
EPCIC Of The Pipeline System For Lampung LNG Floating Storage Regasification Facilities
TOTAL E&P Indonesie Bekapai Phase 2B EPSC2 Project
TOTAL E&P Indonesie Bekapai Phase 2B EPSC2 Project
Provision of Shore Approach Services in Support of the Jangkrik Complex Project
Provision of Shore Approach Services in Support of the Jangkrik Complex Project
KG & KH Riser Replacement Project
KG & KH Riser Replacement Project
KE30 Platform Installation and Subsea Pipeline Laying Project
KE30 Platform Installation and Subsea Pipeline Laying Project
SUBAN COMPRESSION PROJECT
SUBAN COMPRESSION PROJECT
TISSUE MACHINE BLOCK # 11.1 & 11.2 PROJECT
TISSUE MACHINE BLOCK # 11.1 & 11.2 PROJECT
OKI Pulp & Paper Project
OKI Pulp & Paper Project
PENGGANTIAN 1 UNIT SUB STATION
PENGGANTIAN 1 UNIT SUB STATION
CNG Plant Bangkanai
CNG Plant Bangkanai
Viscose ,Spinbath & Spinning Civil Structure & Partition
Viscose ,Spinbath & Spinning Civil Structure & Partition
TREATED DESTILLATED AROMATIC EXTRACT (TDAE) PROJECT
TREATED DESTILLATED AROMATIC EXTRACT (TDAE) PROJECT
Replacement of Grease Plant in Jakarta Lubricants Production Unit of Marketing & Commerce Directorat
Replacement of Grease Plant in Jakarta Lubricants Production Unit of Marketing & Commerce Directorat
SLN Tank Repair and Replacement
SLN Tank Repair and Replacement
NPK Fusion Project
NPK Fusion Project
Engineering, Procurement, Construction and Installation (EPCI) of Subsea facility for TSB Phase 2
Engineering, Procurement, Construction and Installation (EPCI) of Subsea facility for TSB Phase 2
Buntal-5 Project Engineering, Procurement, Construction and Installation (EPCI)
Buntal-5 Project Engineering, Procurement, Construction and Installation (EPCI)
Offshore Pipeline and WHP Installation Services
Offshore Pipeline and WHP Installation Services
Transportation & Installation of Mini Platform
Transportation & Installation of Mini Platform
EPCI Subsea Facility for TSB Phase 2 Development
EPCI Subsea Facility for TSB Phase 2 Development
EPCI Services for the Bison, Iguana and Gajah Puteri (BIGP) Development Project
EPCI Services for the Bison, Iguana and Gajah Puteri (BIGP) Development Project
Construction Work at TDAE Plant Project
Construction Work at TDAE Plant Project
Penggantian Column 011C106 Beserta Accesoriesnya Di Area FOC-II
Penggantian Column 011C106 Beserta Accesoriesnya Di Area FOC-II
EPC for Suban Compression Project
EPC for Suban Compression Project
FL1 Project Mechanical and Piping Works (Package 1A, 2 and 3)
FL1 Project Mechanical and Piping Works (Package 1A, 2 and 3)
Fabrication and Pre Assembling Dew Point Control System And Production Cooler
Fabrication and Pre Assembling Dew Point Control System And Production Cooler
Deareator ID 3800 x 18560 T/T & Tower ID 2700 x 6000 T/T
Deareator ID 3800 x 18560 T/T &  Tower ID 2700 x 6000 T/T
Gajah Baru Project
Gajah Baru Project
MEG Injection Package
MEG Injection Package
Heavy Clad Vessel for Suban Gas Compression Project
Heavy Clad Vessel for Suban Gas Compression Project
Naptha Splitter Column ID. 4,000mm x 12t x 32,330mm
Naptha Splitter Column ID. 4,000mm x 12t x 32,330mm
EPCI Service Contract for: EPCI-1 : PHE-12, PHE-24 and CPP2 Platforms and Pipeline
EPCI Service Contract for: EPCI-1 : PHE-12, PHE-24 and CPP2 Platforms and Pipeline
RDMP Balikpapan Project
RDMP Balikpapan Project