Projects

Offshore Pipeline and WHP Installation Services

Client Name : Ophir Indonesia (Madura Offshore) Pty Ltd

Project Period : 14 December 2018 - 26 November 2020

Project Location : Maleo Field, 76,3m Water depth

Project Scope :

• Installation of the 10” x 11 km subsea pipeline work between Meliwis WHP  and Maleo WHP complete with both risers, new riser clamp installation at Maleo WHP and  crossing with existing 28” EJGP

• Offshore Installation of Mini Jacket Structure for 28” EJGP crossing

• Offshore installation of the Meliwis WHP Jacket (450-475 tons)

• Offshore installation of the Meliwis WHP Deck (100-150 tons)

• Offshore lifting and positioning of the Condensate Stabilizer Skid and Condensate Treatment  Skid (30 tons)

• Offshore lifting and positioning of the Gas Turbine Generator Skid (30 tons) onto  the MPP (OPTIONAL SCOPE)

Project Overview : The Meliwis Field is located in the Madura Straits approx 46 km south of Madura  Island & 142 km east of Surabaya. The field is 10-11 km south of the Maleo gas field, which is commenced gas production in September 2006.
The Meliwis Field was discovered by the Meliwis-1 well in April 2016, which  encountered a 53 m gross column in the Upper Mundu, Globigerinid limestones.  Two drill stem tests (DST’s) were carried out, with a maximum test rate of 13.07  MMscfd. 
The A concept study was performed in early  2017 by Santos which concluded that the  optimum development option is a minimum  facility wellhead platform option tied back to  the Maleo Production Platform (MPP) with  a 11 km 10” diameter subsea pipeline

Other Projects
Eastern Hub Mercury Removal (EHMR) Water Project
Eastern Hub Mercury Removal (EHMR) Water Project
KF Gas Booster Compression Project
KF Gas Booster Compression Project
Lima Power And Safety System Upgrade Project
Lima Power And Safety System Upgrade Project
UL Development Project
UL Development Project
Waste Heat Recovery Steam Generator Project
Waste Heat Recovery Steam Generator Project
Design and Fabrication Equipment Module for Minas Surfactant
Design and Fabrication Equipment Module for Minas Surfactant
EPC of Water Tanks Facility in Three Gathering Station
EPC of Water Tanks Facility in Three Gathering Station
Anoa Phase AGX Compression Reconfiguration
Anoa Phase AGX Compression Reconfiguration
Tembang 8 to Bawal Pipeline System Permanent Tie-Ins
Tembang 8 to Bawal Pipeline System Permanent Tie-Ins
Engineering and Installation Services for Jangkar Umbilical Project
Engineering and Installation Services for Jangkar Umbilical Project
Bukit Tua Field Development
Bukit Tua Field Development
Lima Subsidence Remediation Project
Lima Subsidence Remediation Project
Pembangunan Main Oil Line (MOL) Dari Anjungan XA Process Lapangan X-Ray ke Pusat Pengumpul Produksi
Pembangunan Main Oil Line (MOL) Dari Anjungan XA Process Lapangan X-Ray ke Pusat Pengumpul Produksi
Reroute Gas Pipeline L-Parigi-Cilamaya Project
Reroute Gas Pipeline L-Parigi-Cilamaya Project
EPCI Subsea Facility of TSB Field Development Project
EPCI Subsea Facility of TSB Field Development Project
Ujung Pangkah CPP and AUP Platform Installation Contract
Ujung Pangkah CPP and AUP Platform Installation Contract
Pagerungan Utara Offshore Installation for Wellhead Platform Project
Pagerungan Utara Offshore Installation for Wellhead Platform Project
North Belut Pipelines Installation Project
North Belut Pipelines Installation Project
North Belut Installation of Wellhead Platform Project
North Belut Installation of Wellhead Platform Project
Kambuna Offshore Topside, Riser, and Pipeline Installation
Kambuna Offshore Topside, Riser, and Pipeline Installation
CNOOC EPCI MILA-A And ASTI-A Platforms And Pipelines Project
CNOOC EPCI MILA-A And ASTI-A Platforms And Pipelines Project
EPCI Services For Infill Well Facility Tie In KRA SOUTH 2 Project
EPCI Services For Infill Well Facility Tie In KRA SOUTH 2 Project
EPCIC Of The Pipeline System For Lampung LNG Floating Storage Regasification Facilities
EPCIC Of The Pipeline System For Lampung LNG Floating Storage Regasification Facilities
TOTAL E&P Indonesie Bekapai Phase 2B EPSC2 Project
TOTAL E&P Indonesie Bekapai Phase 2B EPSC2 Project
Provision of Shore Approach Services in Support of the Jangkrik Complex Project
Provision of Shore Approach Services in Support of the Jangkrik Complex Project
KG & KH Riser Replacement Project
KG & KH Riser Replacement Project
KE30 Platform Installation and Subsea Pipeline Laying Project
KE30 Platform Installation and Subsea Pipeline Laying Project
SUBAN COMPRESSION PROJECT
SUBAN COMPRESSION PROJECT
TISSUE MACHINE BLOCK # 11.1 & 11.2 PROJECT
TISSUE MACHINE BLOCK # 11.1 & 11.2 PROJECT
OKI Pulp & Paper Project
OKI Pulp & Paper Project
PENGGANTIAN 1 UNIT SUB STATION
PENGGANTIAN 1 UNIT SUB STATION
CNG Plant Bangkanai
CNG Plant Bangkanai
Viscose ,Spinbath & Spinning Civil Structure & Partition
Viscose ,Spinbath & Spinning Civil Structure & Partition
TREATED DESTILLATED AROMATIC EXTRACT (TDAE) PROJECT
TREATED DESTILLATED AROMATIC EXTRACT (TDAE) PROJECT
Replacement of Grease Plant in Jakarta Lubricants Production Unit of Marketing & Commerce Directorat
Replacement of Grease Plant in Jakarta Lubricants Production Unit of Marketing & Commerce Directorat
SLN Tank Repair and Replacement
SLN Tank Repair and Replacement
NPK Fusion Project
NPK Fusion Project
Engineering, Procurement, Construction and Installation (EPCI) of Subsea facility for TSB Phase 2
Engineering, Procurement, Construction and Installation (EPCI) of Subsea facility for TSB Phase 2
Buntal-5 Project Engineering, Procurement, Construction and Installation (EPCI)
Buntal-5 Project Engineering, Procurement, Construction and Installation (EPCI)
Offshore Pipeline and WHP Installation Services
Offshore Pipeline and WHP Installation Services
Transportation & Installation of Mini Platform
Transportation & Installation of Mini Platform
EPCI Subsea Facility for TSB Phase 2 Development
EPCI Subsea Facility for TSB Phase 2 Development
EPCI Services for the Bison, Iguana and Gajah Puteri (BIGP) Development Project
EPCI Services for the Bison, Iguana and Gajah Puteri (BIGP) Development Project
Construction Work at TDAE Plant Project
Construction Work at TDAE Plant Project
Penggantian Column 011C106 Beserta Accesoriesnya Di Area FOC-II
Penggantian Column 011C106 Beserta Accesoriesnya Di Area FOC-II
EPC for Suban Compression Project
EPC for Suban Compression Project
FL1 Project Mechanical and Piping Works (Package 1A, 2 and 3)
FL1 Project Mechanical and Piping Works (Package 1A, 2 and 3)
Fabrication and Pre Assembling Dew Point Control System And Production Cooler
Fabrication and Pre Assembling Dew Point Control System And Production Cooler
Deareator ID 3800 x 18560 T/T & Tower ID 2700 x 6000 T/T
Deareator ID 3800 x 18560 T/T &  Tower ID 2700 x 6000 T/T
Gajah Baru Project
Gajah Baru Project
MEG Injection Package
MEG Injection Package
Heavy Clad Vessel for Suban Gas Compression Project
Heavy Clad Vessel for Suban Gas Compression Project
Naptha Splitter Column ID. 4,000mm x 12t x 32,330mm
Naptha Splitter Column ID. 4,000mm x 12t x 32,330mm
EPCI Service Contract for: EPCI-1 : PHE-12, PHE-24 and CPP2 Platforms and Pipeline
EPCI Service Contract for: EPCI-1 : PHE-12, PHE-24 and CPP2 Platforms and Pipeline
RDMP Balikpapan Project
RDMP Balikpapan Project